TEHRAN, Jun. 11 (MNA) – The third platform of Iran’s South Pars gas field’s phase 14 (14B) was shipped to be installed on its designated offshore spot, on Tuesday.
TEHRAN, Jun. 11 (MNA) – The third platform of Iran’s South Pars gas field’s phase 14 (14B) was shipped to be installed on its designated offshore spot, on Tuesday.
Your Comment