Photo Publish Date: 11 June 2019 - 18:00 By: Rahbar Emamdadi 3rd platform of South Pars phase 14 loaded to be installed on offshore spot TEHRAN, Jun. 11 (MNA) – The third platform of Iran’s South Pars gas field’s phase 14 (14B) was shipped to be installed on its designated offshore spot, on Tuesday. 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot 3rd South Pars platform loaded to be installed on offshore spot Related News Gas output in SPGF to increase by 60 mcm: CEO Fire contained at SPD9 platform; no casualties Iran's biggest gas storage center goes on stream in Sarakhs Topside of Salman offshore fields being readied for loading Iran saves $150m by domestically building 4 South Pars platforms Tags South Pars Gas Production Phases 14 and 15