Located 25 kilometers from Yasuj-Gachsaran road and covering an area of 63.5 hectares, the inaugural ceremony was attended by the speaker of the Sixth Majlis Mahdi Karrubi and some provincial officials.
The construction of this factory by domestic technicians and specialists is projected to save $11 million in foreign currency exchange per annum.
The report added that the cost of establishing the factory was almost Rls.200 billion and 250 jobs are predicted to be created.
All the factory machinery has been imported from China and the volume of foreign exchange embodied in construction of the Yasuj factory is $14.7 million.
HK/DWN/IS
END
MNA